The completed Rutecky pool and outdoor living space in Brookhaven
On the day it becomes yours

The exit meeting most builders rush through.

When construction ends, Atlantis holds an exit meeting on your property: Kelly or Bruce walks the finished pool with you and teaches every component, from the equipment pad to the automation panel. You leave knowing how your pool works, not just that it works, backed by a warranty stack that starts the same day.

The Atlantis Studio

Rutecky · Brookhaven

Twelve to fourteen weeks of construction end the same way every time: not with an invoice, but with a walkthrough. This is the meeting where the project stops being a job site and starts being your backyard. Most builders hand over a punch list and a phone number. Atlantis walks the property with you, component by component, until you understand what you're looking at and what to do with it.

Why the last day of construction matters as much as the first.

A pool with the wrong chemical balance, an automation panel nobody explained, or a warranty nobody wrote down turns ownership into guesswork. The exit meeting is where that guesswork gets replaced with a real understanding of your own system, while the people who built it are still standing in front of you.

A finished pool is a system, not a feature. There's a filtration loop, a sanitation method, an automation panel that runs the lights, the water features, and the spa jets, and a shotcrete shell built to outlast the house behind it. None of that is obvious from looking at it. A homeowner handed a folder of manuals and a wave goodbye ends up calling someone else, or guessing, the first time the chemistry drifts or a light stops responding to the app.

The first month after fill is also the month a new pool is least forgiving. A new pebble finish is still curing. Water chemistry needs closer attention than it will need in year two. This is exactly the window where Atlantis includes a full month of service, chemical balancing done for you while you get used to the system, so the learning curve doesn't happen at your own expense.

What actually happens at the exit meeting.

The exit meeting has three parts: a full walk of the finished property, a hands-on lesson on every mechanical component, and a written review of what's covered under warranty and for how long. Nothing is handed to you without also being explained.

01

What does "walking the project" actually mean?

Kelly or Bruce walks the entire finished environment with you, not just the water: the pool, the decking, the pavilion, the fire feature, the outdoor kitchen if you built one, and the drainage the site analysis planned for and how it's performing now that it's built, pointing out how each piece was built and what it needs from you going forward. You see the finished version of every decision made back at the design table.

Aerial view of the finished Rutecky backyard in Brookhaven, the pool, decking, and landscape reading as one connected environment
Rutecky · Brookhaven
02

What do you actually learn to operate at handoff?

You learn the equipment pad, the filtration and sanitation system, the automation panel that controls lights, water features, and spa functions, and basic chemical balancing, taught hands-on so you can operate the pool with confidence from day one, not by trial and error. This is the part most builders skip or rush: you run the automation system yourself while Bruce or Kelly answers the question you didn't know to ask, and you learn what a normal chemical reading looks like, so you recognize when something is off later, even with the first month of balancing handled for you.

03

What's actually covered, and for how long?

Atlantis backs every pool with a lifetime warranty on the shotcrete structure and the pebble finish, three years on Hayward equipment, four years on lights, and one year on workmanship, walked through in person at handoff, coverage line by coverage line against the actual pool you're standing next to, so you know what a lifetime structural guarantee means for your shell specifically, and what happens if a Hayward component needs attention inside its three years, before you ever need to use it.

ComponentCoverage
Shotcrete structureLifetime
Pebble finishLifetime
Hayward equipment3 years
Lights4 years
Workmanship1 year
First month of service (chemical balancing)Included

What the first morning with a finished pool actually looks like.

The morning after handoff is the first one where the pool is simply yours: no crew on site, no schedule to check, just the water, the deck, and whatever you built around it, ready for the life it was designed for.

The equipment pad hums quietly on its own schedule. The water holds the temperature you set the night before. Whatever you pictured at the first site visit, a tanning shelf wide enough for two chairs, a fire table for October evenings, a spillway you can hear from the kitchen, is no longer a rendering. It's the thing you walk out to.

Aerial view of a finished Atlantis pool holding its line against the house behind it, the quiet of a completed backyard the morning after handoff
Lipson · Atlanta

What handoff sets up for the years after.

Handoff is the start of ownership, not the end of the relationship: the first month of included service, the standing warranty, and the sister service company, already familiar with your pool by handoff day, brought in during construction rather than cold afterward, all carry forward from the exit meeting into everyday ownership for as long as you own the pool. That continuity is the difference between calling a stranger and calling someone who already knows your equipment pad.

Continue to what ownership looks like over time

Questions buyers ask about handoff and the exit meeting.

Who attends the exit meeting?

Kelly or Bruce walks the property with you. They built the relationship from the first site visit through construction, so the same people who designed and built your pool are the ones teaching you how to run it.

Do you provide the warranty information in writing?

Yes, the coverage terms, lifetime on the shotcrete structure and pebble finish, three years on Hayward equipment, four years on lights, one year on workmanship, are documented and walked through with you in person so nothing is a surprise later.

What happens if something goes wrong after handoff?

Call Kelly or Bruce anytime. The sister service company that supports Atlantis clients after the build was involved during construction, so whoever helps you already understands your specific pool, not a generic one.

Is chemical balancing included after the pool is filled?

Yes, the first month of service, including chemical balancing, is included after fill. That's the window when a new plaster or pebble finish needs the closest attention, and Atlantis handles it while you get comfortable with the system.

Request a complimentary site visit.

Construction typically takes twelve to fourteen weeks after design, contract, permitting, and any HOA approval are complete. Everything in between leads to the same walkthrough described above. If you're picturing that morning already, the first step is a free site visit with Kelly, on your property, with no pressure to decide anything yet.

4.8 average across 151 reviews. BBB A+ accredited since April 2012.

Call the studio(770) 833-9347Request a site visit